Friday, July 27, 2007
Dangers, but also Opportunities
While there are not many details available at this time, it is known that the accident occured during a test of the propulsion system. This was a sobering event for us, as it reinforced the fact that what we are doing can be dangerous and requires the utmost care.
We are currently in the building permit phase of our propulsion test site development. A lot of effort is being put into eliminating the risks that can be eliminated, in into mitigating the risks that cannot be eliminated. Oversight on this process is being provided by university professors, lab health & safety officials, building officials, and fire prevention officials.
There will always be risk, and we will always have to be careful.
Saturday, July 21, 2007
Team Meeting July 21 2007
NEXT MEETING AUGUST 11
Kirsty brought us awesome pens that look like 1930's-style rockets! They have a fuel tank filled with gel (no slosh baffles), and an led in the engine area. Courtesy of her Dad and AT&T.
Curtis - Launch Systems
-He is going to pick up the hydraulic parts for the launch rail from Princess Auto
-The 46' Expo truss is getting moved onto a trailer for us, stored in yard until we need it
-Still working out how to connect truss to whatever trailer/platform we use as the base
-Need to have truss properly inspected, one buckled member needs to be replaced, need someone "qualified" to advise on how to properly inspect
Joel (on behalf of Trian) - Aerostructures
-got new team account set up in MECH department, moved funds over from old IGEN account, ready to cut purchase orders through MECH department
Cedric - Industry Advisor
-introducing James to resources at local aerospace company for potential combustion chamber machining (we are hoping to get them to sponsor us), estimating FMC programming and planning work hours
-getting machining done in the near term will be difficult as they are very busy
Marco - test stand building permit
-unfortunately no luck getting anyone to sign off on design
Kirsty, Sebastian, Aaron - Avionics
-need to track down missing components from Jon/Leigh (DAQ and microprocessor) - they are probably at someone's house
-Kirsty got a key for the CHBE workshop and we have moved everything over there
-ready to order Omega sensors, Ozark GPS transmitter/receiver, and 3 DOF accelerometers
James - Propulsion
-RFQs for tanks, plumbing, most valves done, ready to order
-worked on updated sponsor info, milestones, budget, etc
-discussion of milestones
-Alumni update: 3 ISU masters students, 3 working in aerospace manufacturing, one (soon possibly two) working for NASA
Winnie - Propulsion
-working on Fire Safety Plan for test facility, almost done, need contacts for emergencies
-have been busy with Fizz robot project
Joel - Project Coordinator
-sponsorship package updated, will bring a copy to next meeting
-next meeting would fall on saturday of the BC Day long weekend, so reschedule to Aug 11
Wednesday, May 23, 2007
Ramping up for Summer
Wednesday, April 18, 2007
Recovery Update
We’ve been working on determining parachute design requirements over the past several weeks. We want to buy an already made parachute. We considered personnel parachutes, but these don’t slow our rocket down enough. The rocket would land at 7 m/s. This is too high and would result in serious damage. A cluster of 3 personnel parachute is a possible solution, but this would introduce unneeded complexity. So, we were looking for large cargo parachutes. We found several 64 foot diameter parachutes for a reasonable price. They would slow our rocket down to a safe landing speed of 3.6 m/s. The only problem is that they come without the lines. Also, we found an appropriate drogue chute. The next step would be to see how these can be integrated into our design. If everything turns out OK, the parachute and the drogue chute will be bought.
Air brake final drawings have been reviewed and the bill of materials for the air brakes has been finally created. Above is a pic of our air brake design.Sunday, April 15, 2007
Light Posting till the 28th
We still need to get a building permit, which will take some time as we have to find a P.Eng. to provide assurance for the "building" (i.e. blockhouse) design. This will be difficult as most qualified professors don't have insurance to cover this, and because all the civil engineering P.Engs in Vancouver are up to their eyeballs in work with the huge development boom that's going on. Finding someone willing to give our structure a lookover on a pro bono basis is going to be tough.
Should any interested, qualified individuals read this, why not send us a message and let us know? We would be immensely grateful for the support, and would be happy to list you or your company as a sponsor for the donation of your time.
Tuesday, April 3, 2007
Forging Links with Other Student Rocketry Teams
Links:
UCSD Hybrid Rocket Project
Daedalus Astronautics
Monday, April 2, 2007
Engine Modeling Progress
Later this week, I plan to complete the models of the saddle parts and the jacket. Over the weekend or next week, the injector plates will be modeled. After that, it'll be out to the machine shop and on to flow testing!